- News
- Wet curtain air cooler refrigeration room layout and installation
- The liquid refrigerant in the refrigeration system problems
- Selection of refrigeration system condensers
- Detail the evaporation temperature of refrigeration and air conditioning systems
- Ammonia refrigeration compressor common faults and troubleshooting
- Refrigeration system in a large data center trends
- Refrigerating device fault analysis of automatic control
- Maintenance and repair of air conditioning and refrigeration compressors are three methods
- How to judge the refrigeration equipment is working properly?
- Three maintenance testing methods for air conditioning and refrigeration compressors
Refrigeration room layout
Release time:2016-10-24 16:00:35
Set the refrigeration room called the refrigerator or freeze. Small refrigeration roomusually attached to the main building of the basement or the ground floor of a building. Large-scale refrigeration room, in particular ammonia refrigeration room, needs to be built separately.
Refrigerator the refrigerator in the room as well as matching with the chiller refrigeration, cooling water pump weight, vibration and noise when running, usually arranged on the ground floor or the basement. When is a tall building with podium, refrigeration room the best layout in the podium building of basement and good noise isolation, particularly water pump amount frozen, pipe supports and hangers vibration reduction. Refrigeration room adjacent and upper rooms should be the requirements for noise isolation high places.
Supporting the refrigerators and refrigerator freezing, cooling water pumps and other equipment are building energy consumer and its location should be as close as possible to the load Center, and low-voltage distribution approaches, and the best set up near the escalators.
Set to send, within the refrigeration room ventilation equipment, so as to remove indoor waste heat and fresh air. Room temperature should be less than 36 degrees centigrade. Room noise control measures should be taken to prevent unit noise effects spread to air conditioning in the rooms or outdoor environment. Set up artificial lighting within the room, around the control switch and instrument operation to haveplenty of illumination.
Chiller room should be higher ground the basis of between 150 and 200 mm. Around the base and on the basis of sewer and sump of the engine room or floor drains connected to discharge possible leaking oil.
Lifting equipment such as refrigeration, cooling water pipes of floor shall have sufficient capacity and to deal with the problem of noise isolation.
Refrigeration room shall meet the national fire safety measures all relevant code forfire protection design requirements.
Chiller, in the refrigeration room the larger size and weight of the device, and therefore should be taken into account when setting refrigeration room equipment accessibility problems. Electromechanical equipment service life is shorter than the building of reserve equipment installation and control of hole should have measures that at the time of replacement of mechanical and electrical equipment can open.