Navigation:Refrigeration/cooling/refrigeration equipment engineering-Shanghai Ying Xiang refrigeration equipment limited >> News >>

Refrigeration and air conditioning system test FAQ summary

Release time:2016-12-06 14:18:34
Refrigeration and air conditioning systems, equipment and conditions varied levelsof design, construction, commissioning and operation are limited, current refrigeration and air-conditioning systems in buildings there are many problems, so the system is an integral part of the.
For refrigeration and air conditioning engineering in General, debugging including:each part of electrical equipment and circuit check; operation of refrigeration and air conditioning equipment testing; automatic control system commissioning of eachlink; refrigeration air conditioning air flow in the room parameter adjustment, and so on.
 
, Air cooling system test FAQ
(A), refrigeration and air conditioning system when debugging a local well.
1, causes:
(1) system for objects blocking.
(2) part of system design is reasonable and does not adjust properly.
2, improvements:
Clear the foreign body and full cleaning, adjusting the pipe slope.
(Ii), the pump turn the vibration and noise are larger.
1, causes:
(1) large coupling with axial and radial deviation of the device itself.
(2) pump flange is bigger, and the uneven loading of the anchor bolt.
(3) similar to the natural frequency of the pump and pipeline caused by resonance.
2, improvements:
Adjust the coupling axial and radial deviation. Adjust the frequency of natural vibration between pump and piping, installation of soft parts. Replacement of flanges andbolts even by force.
(C), chiller cooling capacity up to the rated value.
1, causes:
(1) cooling tower water cooling of up to less than the required parameter.
(2) insufficient output of pump.
(3) the dislocation and unable to cool condenser isolation pad.
(4) in the condenser pipe plug.
2, improvements:
Maintenance to comply with the temperature of the cooling tower and water requirements. Removal of foreign body pipe, check the condenser isolation pads for dislocation
(Iv) refrigeration discharge pressure too high.
1, causes:
(1) lack of cooling water.
(2) serious condenser fouling in heat transfer tubes.
(3) cooling water temperature too high.
(4) excessive air in the system.
2, improvements:
Cooling tower maintenance, cleaning the condenser tubes, excluding air in the system.
(E) severe frost, refrigeration and air conditioning units run time.
1, causes:
(1) air filter clogged.
(2) the fan belt loose rear air flow is not enough.
(3) air valve opening too small.
2, improvements:
Cleaning the air filter, adjust the fan belt. Adjust the size of return-air valve.
Second, refrigeration and air conditioning system need to pay attention to several problems in the process
(A) the work, getting ready for a debug-oriented
Debugging preparation is an important part of debugging, it will affect the entire debugging process generally includes the following steps:
1, pipe leak detection system. Air duct system leakage at the national standard GB50243-97 in the detailed provisions, roughly divided into high pressure systems, different pressure air pipe per hour per square meter of air leakage value.
2, Visual assessment of pipeline systems. The main content of this work is to check the pipeline system, determine diffuser, tube and head on the valve is in the fully open position, ensure that the pipeline system in the entire State.
3, equipment preparation. Debugging job, to be ready for the test equipment required including temperature, humidity, pressure, and speed (flow), the equipment needed for the speed.
After you complete the above work can begin debugging, but due to the commissioning of refrigeration and air conditioning system is a practical work, preparations are different piping systems and their installation in the early work, in practical work, we should pay attention to this point.
(Ii), the cold water system
Cold water system of general steps:
1, the first floors of the fan-coil inlet pipe and cooling equipment off and open cold water pipes on each floor of supply and return pipe connected between the valve, as some major system chiller to protect the evaporator, also designed for the water connection pipes, chillers for water in and out of the valve should be close together,opened the connecting pipe;
2, start the cooling water pumps to clean pipes, at least half a day;
3, drain the water in the cold water pipe, rinse cold water pump inlet filter, time permitting, put the filter back again to fill system clean.
4, in centralized refrigeration and air-conditioning chilled water, cooling water system design, must be large equipment and floors of main cooling pipe set the bypasspipe with a valve at the end, to facilitate cleaning.
5, if not open pump, cleaning by water injection, water pipes, for most systems (strict supervision, construction process piping is clean except when construction is complete), is totally not up to pipeline cleaning requirement. Pipe cleaning after the refrigerator can be opened for debugging purposes, hosts start commissioning is usually sent by the supplier is responsible for, this will help the two sides reduce contractual disputes.
6, further debug works is the end for refrigeration and air conditioning, pumps, andhost open cases, debugging them one by one to the end. Opened previously shut off the supply and return pipe at the end of the valve, shut off the pipeline open supply and return water when cleaning supervisor and the bypass valve on the main circuit, two-port valve is normal, not normal to see if the wiring problem, there is no electricity, is the valve coil has been burned to the ground. If coils are burned withoutspare parts, forced open the two-way valve valve manual switch for debugging.
(C), fan-coil plus fresh air systems air improper arrangement of issues
Fan-coil plus fresh air systems in hotels and office blocks commonly used in refrigeration and air conditioning system, this way not only the effect of refrigeration and air conditioning and installation is simple. The design process must be reasonably fresh air and fan-coil outlet combinations, otherwise it will affect the effect of refrigeration and air conditioning.
Fresh air system debugging is in the fan-coil unit stops running conditions (fan-coilfan itself stopped working), determination of fresh air volume in each room is in thiscase.
And in actual of system run situation Xia, all room of wind machine disc tube does not necessarily all run (room within independent control), for wind machine disc tube started of room for, wind machine disc tube of back bellows within formed negative pressure district, for not run of wind machine disc tube of back bellows is no, this on on whole air system of air balance caused damage, makes into not started of room of air support tube of air difference disparity, individual not started of wind machine disc tube of air support tube even formed negative pressure, Indoor air enters the air pipe and into the other room, causing deterioration of air quality from all rooms inthe system.
When fresh air when the tube connected to the fan-coil air supply pipe, similar problems will arise. To avoid such problems arise, should be fully considered in the design of fan-coil effect on its connection systems, fresh air supply outlet should set up an independent pipeline.
(D), debugging in the summer heat
According to develop standards for air-source heat pump water chiller, the rated heating capacity of unit refers to the ambient temperature of 7 degrees Celsius, watertemperature is 45 ° c the heating capacity of the unit.
In practical work, due to ambient temperature difference requires heating in winterand cooling air conditioning system water temperature and the heating capacity of the unit change. Heating of the air source heat pump water chiller with hot water outlet temperature increase and decrease, decrease with decreasing ambient temperatures. Power input of the unit in heating condition is as hot water temperature increases, with ambient temperature decreases.
This is mainly due to the hot water outlet temperature increases the condensing pressure increase at this point if the ambient temperature is not the same, then the compressor pressure ratio, per kg refrigerant compressor power consumption increase, resulted in increased compressor input power.
When the environment temperature reduces the evaporation temperature, compressor refrigerant flow is reduced, due to the air side heat exchanger with frosting, heatand temperature, flow faster, the corresponding compressor input power is greatly reduced. Normally when ambient temperatures down to-4 ° c ~-5 ℃ below to start auxiliary heaters in heating systems water, to compensate for attenuation of the air-cooled heat pump unit heating capacity.
(V), the use of computer-aided debug
In practice, many refrigeration and air conditioning systems are extremely complex,balance difficulty is high, so debugging is divided into debugging and trial phases.
A case study of wind system, under normal circumstances, regulation branch at thebeginning of every outlet after the adjustment is completed, air has some influenceon the other outlet. After a successful initial adjustment, enter the trial phase, if successfully most outlet do not need regulating or adjusting air volume is small, the entire system changes, except some unstable air, but air between effects can be ignored.
This shows that the early commissioning phase is very important. Starting point forcomputer-assisted debugging techniques is that no matter what debug method is used, the results should meet: every design air outlet of the actual air volume shouldbe ± 10%; system index circuit of diffuser valves are fully open.
In domestic, due to debugging personnel belongs to equipment installation company, can in equipment installation process in the contact air regulation device, if can prior according to air design requirements, through computer auxiliary calculation, obtained the valve of pre adjustable open degrees, installation Shi can this based Shang, for corresponding of valve open degrees adjustment, such on very helps improve wind system debugging speed and efficiency, reduced debugging costs, this a advantages in large refrigeration air conditioning system will performance have more highlight.