Correct sewage 7 big points of refrigeration system

Release time:2016-12-06 14:16:54
Points of sewage, cooling system
 
1, refrigeration system pipe runs must be conducted before discharge, to clear the residue in the system during the installation of welding slag, scrap iron, sand and dirt. Prevent dirt damage cooler parts and valves in the system, and avoid blocked pipeline.
 
2 sewage, ammonia refrigeration system used ammonia refrigerator air compressoror compressed air, compressed air pressure does not exceed 0.6MPa. Outlets should be set in the at the bottom of the pipe, sewage can be grouped, segmented tiered.
 
3, sewage of normally no less than 3 times, until the vent air without water vapor, grease and rust and other debris.
 
4, in order to effectively use the explosive force of the compressed gas and jet stream, you can install a valve on outlet until the pressure in the system rises quickly opens the valve so that the gas flowing rapidly, out of the dirt.
 
5, the practice can also be used a cork Plug Outlet, when the system has a certain pressure, Cork pulled out so that the air flowing rapidly, this method is very good. Butthere is a certain danger when doing so be careful, be safe.
 
6, freon systems of sewage in the system after installation, use 0.6MPa segment of nitrogen blow dirt. Method and inspection of the sewage and ammonia systems, sewage and freon system when pressure testing you cannot use compressed air, compressed air contains water vapor, residues within the freon system, will cause a freon system ice-jam or ice jam.
 
7, in the process of sewage, if found any obvious leaks, piping flanges valves should be remedied in a timely manner. Systems of sewage after the system should be all the valve spool filter should be removed and cleaned.
 
Second, sewage and the leak of the refrigerating system safety steps
 
1, the pressure relief valve on the nitrogen bottle, with nitrogen gas pipe connectingthe ammonia nitrogen bottle valve and the system valves;
 
2, the valve on the nitrogen bottle, with nitrogen gas pipe connecting the ammonianitrogen bottle valve and the system valves;
 
3, valve open valve of ammonia and nitrogen, nitrogen to the low voltage section test pressure to the system;
 
4, close the valve of ammonia and nitrogen valve, with the hair brush SOAP or detergent for all welding, pipe fittings, flanges, valves, connections, sealing parts applied,leak;
 
5, find the leak, tick, after identifying a number of leaks, the operator at the sewageoperation safety position open low pressure circulation receiver (or gas-liquid separator) screw in the lower part, discharge and release nitrogen;
 
6, and trap, twist Shang low voltage cycle storage liquid device (or gas liquid separation device) of screw plug, again filling into nitrogen, operation personnel is located in sewage operation security location twist open Middle cooling device lower of screw plug, sewage and released nitrogen; beauty series is a paragraph micro-letter graphic Edit tool, has most full up of of template for you looking for, Xpress transform style color, let typesetting more happy!
 
7, repeat the last two steps until no leaks;
 
8, close the low pressure circulation receiver (or gas-liquid separator) into valve anddrain valve, close the discharge out of valve and drain valve, compressor suction valve and discharge valve, nitrogen to the high voltage section test pressure to the system;
 
9, the high voltage part of the leak, find the leak, tick, after identifying a number of leaks, operators in the sewage operation safety screw lower part of kaipai liquid barrel plug, sewage disposal and release nitrogen;
 
10, traps, unloading barrels on the screw plug again filled with nitrogen gas, operators at the sewage operation position unscrew lower part of high pressure liquid receiver plug screw, sewage and release nitrogen;
 
11, repeat the last two steps until no leaks.